Thank you for your interest in the Concourse C Midpoint Expansion located at the Hartsfield Jackson Atlanta International Airport in Atlanta, GA

The Concourse C Midpoint Expansion project includes selective demolition of the midpoint concessions and structure at Concourse C as well as construction of new one (1) story expansion.  New structure is a concrete frame with metal panel and glass skin.  The project will consist of new concession and retail space, additional escalators, interior finishes and new Mechanical, Electrical, Plumbing, and Airport Special Systems within the expansion area.  This project also includes modifications to apron paving, gate striping at 12 gates.

Project is scheduled to begin construction July 2013 and has a substantial completion date in mid 2015.


Prequalification Process

In order to qualify for award of any scope of work, interested bidders must fully complete the HMBB, JV Prequalification Form (link provided) and submit to: 


Bryson Barnes at bbarnes@brysonconstructors.com 

· HMBB Prequalification Statement

Note: Interested Bidders must meet the following criteria in order to be considered for selection:

  • Completed Prequalification Statement
  • Experience Modification Rating Below 1.0
  • Provide a Bond Commitment Letter Prior to Award
  • Be Willing to Review Company Financial Data Prior to Award
  • Meet Insurance Requirements
  • Review and agree with HMBB, A JV Request for Proposal (RFP) and all standard Subcontract terms

 

 

Drawing and FTP Access

Interested bidders may access the Holder FTP site (access instructions in link below) to download copies of their respective Construction Documents and Specifications for bid. In addition to the drawings and specifications, all approved bidders must obtain the HMBB RFP from the FTP Site and review all documents prior to bid for a complete proposal submission.  Drawings may also be obtained from the reprographic company listed below:

· Holder Construction FTP Site

Username: Concourse C
Password: hjaia

There will be a new set of drawings issued on Monday, April 29 2013.


Introduction / Pre-Bid Meeting:

Project Information Session:

Located - Holder Construction Company

3333 Riverwood Parkway Atlanta, GA 30339

Session 1 (April 8, 2013 at 3:00 PM. First Floor Conference Room):

Earthwork/Site Utilities,  Transformer Building (GC), Drilled Piers, Apron/Concrete Demolition, Turnkey Concrete, Elevators/Escalators, Sheeting/Shoring, Miscellaneous/Structural Steel, Mechanical, Apron Paving (Turnkey), Demolition Electrical, Waterproofing/Caulking, Fire Protection, Glass/Glazing, Metal Panels, Roofing, Masonry

Session 2 (April 8, 2013 at 4:30 PM. First Floor Conference Room):

Overhead Doors, Painting, Ornamental Metals, Finish Flooring, Drywall/ACT, Doors/Frames/Hardware Material, Door Installation, Trash Chutes, Signage, Specialties, Fireproofing


Scope Packages / Pricing Dates

 

Please note the following Scope Packages and the Trade Responsible Engineers for your respective scopes of work:

 Associate

Phone

Trades

Email

Anthony Inya-Agah

770-858-1458

Earthwork/ Site Utilities, Apron Paving, Sheeting & Shoring,  Saw cutting, Turnkey Concrete, Deep Foundations, Drilled Piers, Apron Concrete Demolition

Ainya-agha@bmmllc.com

Titus Jackson

770-988-3370

Mechanical, Electrical, Plumbing

tjackson@holder.com

Bryson Barnes

770-858-1499

Painting, DFH Material & Install, Ornamental Metals, Masonry, Specialties, Trash Chutes, Signage, Transformer Building, Drywall/ACT, Doors/Frames/Hardware, Door Installation

bbarnes@brysonconstructors.com

Adrienne Thomas

 

770-858-1487

Selective Demolition, Metal Panels, Glass & Glazing, Roofing, Drywall, Structural Steel, Waterproofing/Caulking, Elevators/Escalators, Miscellaneous/ Structural  Steel

athomas@holder.com

 

 

 

 

Pricing Package #2 Due Date:               Tuesday, May 14th, 2013

 

 

Pricing Package #2 Due Date: Tuesday, May 14th, 2013